The ultimate Fabric, Power BI, SQL, and AI community-led learning event. Save €200 with code FABCOMM.
Get registeredEnhance your career with this limited time 50% discount on Fabric and Power BI exams. Ends September 15. Request your voucher.
Beginning two weeks ago, certain dataset refreshes are now failing with the data source error message of "Data source errorWe're sorry, an error occurred during evaluation.;The evaluation reached the allowed cache entry size limit. Try increasing the allowed cache size.. The exception was raised by the IDbCommand interface."
I tried clearing the cache and increasing the cache size in the pbix file, but no luck. I am able to manually refresh the pbix file and publish to the workspace, but the automated or manual refreshed in the service fail.
The datasource included in the pbix include: SQL and SharePoint Excel files.
Any ideas on how to address this issue or when it will be resolved?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi @BrandonLyons ,
Have you turned on Query Caching?
Organizations with Power BI Premium or Power BI Embedded can take advantage of query caching to speed up reports associated with a dataset. Query caching can also reduce load on your Premium/Embedded capacity by reducing the overall number of queries.
For more information, please refer to:
Query caching in Power BI Premium - Power BI | Microsoft Learn
Best regards,
Community Support Team _Yadong Fang