Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!The Power BI Data Visualization World Championships is back! It's time to submit your entry. Live now!
The Asana connector, which I understand to be made by Microsoft, pulls incomplete data. Specifically, if I export a project as a .csv it includes subtasks; however if I use the asana connector subtasks are missing. The subtask task ID and Task name are the same columns as non subtasks, but the connector is missing the parent task column, which contains data only for subtasks.
I'm not sure if I picked the right idea labels, apologies.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.