Dear PowerBI Team
I have seen other posts, where the same error occured, due to limited source data availability.
But because the error occurred more than 3 times in the last 2 weeks I'd like to make a point to
Feature Request
It would be helpful to get more detailed, cause related error messages and last but not least, PowerBI scheduled refresh should automatically retry a refresh (i.e. 3 times after 5 min wait) in case of failure due to limited source data availability. It would be best, if the retry behaviour could be configured as part of the dataset refresh schedule settings.
Service Availability Request
In the context of using services from the same provider (Microsoft) from the same geo location (North Europe),
I would expect a more reliable source availability - assuming the error indicates an availability issue...
Message: | The command has been canceled. |
Cluster URI: | WABI-NORTH-EUROPE-redirect.analysis.windows.net |
Activity ID: | c85882d9-b1ec-44bf-ba2b-09d70708ae5b |
Request ID: | 1d0d955a-b39c-4ada-8194-f6c8df47c3b3 |
Time: | 2017-10-13 01:35:24Z |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.