Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!Calling all Data Engineers! Fabric Data Engineer (Exam DP-700) live sessions are back! Starting October 16th. Sign up.
Hi,
We are building a simple table report from a SharePoint Online list. The dates in the PowerBI column are one day before the dates in the SharePoint list (e.g 2 Apr 19 (SP) = 1 Apr 19 (PBi).
Some help would be appreciated.
Chris
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.