The ultimate Fabric, Power BI, SQL, and AI community-led learning event. Save €200 with code FABCOMM.
Get registeredEnhance your career with this limited time 50% discount on Fabric and Power BI exams. Ends September 15. Request your voucher.
After connecting an existing Fabric/Power BI workspace to Git, selecting the option to have the Git repo overwrite what's in the workspace, and waiting for the sync to complete, an Uncommitted change shows up for the Power BI dataset. I'm not sure what this change is, but it happens every time I do this. I'm wondering if its a bug or a behavior that should be altered.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.