Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!Calling all Data Engineers! Fabric Data Engineer (Exam DP-700) live sessions are back! Starting October 16th. Sign up.
After connecting an existing Fabric/Power BI workspace to Git, selecting the option to have the Git repo overwrite what's in the workspace, and waiting for the sync to complete, an Uncommitted change shows up for the Power BI dataset. I'm not sure what this change is, but it happens every time I do this. I'm wondering if its a bug or a behavior that should be altered.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.