The ultimate Fabric, Power BI, SQL, and AI community-led learning event. Save €200 with code FABCOMM.
Get registeredEnhance your career with this limited time 50% discount on Fabric and Power BI exams. Ends September 15. Request your voucher.
Hi,
I have set up my dataset to auto-refresh every day in the morning, but lately, the refresh has failed with the message below:
We're sorry, an error occurred during evaluation.;Unable to read beyond the end of the stream. Unable to read beyond the end of the stream. Unable to read beyond the end of the stream.. The exception was raised by the IDbCommand interface. Table: XXXXX.
It does work when I refresh it locally with PBI desktop.
How can I figure out what might be going wrong?
Is there a way to run performance analysis on the refresh process to figure out which steps are costing the most?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.