Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!Join the Fabric FabCon Global Hackathon—running virtually through Nov 3. Open to all skill levels. $10,000 in prizes! Register now.
Trying to connect PowerBI to pull data directly from EPM Cloud but getting an error message. Does anyone know how to get around this? Or faced a similar issue before?
Is this even possible? Or one would need to only use a VNET (saw this from doing a little research online)
Thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.