Power BI is turning 10, and we’re marking the occasion with a special community challenge. Use your creativity to tell a story, uncover trends, or highlight something unexpected.
Get startedJoin us for an expert-led overview of the tools and concepts you'll need to become a Certified Power BI Data Analyst and pass exam PL-300. Register now.
Hello,
A few days ago I added a new data-source to a Power BI Report. It's a csv file located in a OneDrive folder. (same folder as existing csv files used in this same report.
Since I added this report the scheduled refreshes have been failing with the below error message: (previous to this the report has been refreshing every day successfully for 1 year +)
Data source error: The credentials provided for the Web source are invalid. (Source at xxxxx). The exception was raised by the IDbCommand interface. Table: quality_check_2_test.
Cluster URI: WABI-US-EAST2-redirect.analysis.windows.net
Activity ID: 89abbbf7-3047-49be-b144-dd03dba9dd9b
Request ID: 74e62357-1d06-4b94-67b9-3784ce10492e
Time: 2022-07-01 07:48:09Z
I checked Azure Logs and can see the following error for Microsoft Power Query for Excel (on 27/06/2022):
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.