failed scheduled refresher on datasets and dataflows should not count.

In PowerBI Pro license the max refresh per day is 8.

As there is no retry option built in we have followed Microsoft Learn to create a Power Automate flow that retries failed refreshes after a period of 15 minutes.


If the refresh runs fine 2 times (8:00 and 9:00) and then fails at 10:00, our Power Automate flow reruns it at 10:15 where it succeeds. The rest of the refreshes work as intended at 11:0013:0014:00 and 15:00. But when the scheduled refresh should run at 16:00 it gets capped by the refresh limit of 8 refreshes per day.


I see this as a design flaw.

Please adjust the way that the refreshes are counted, so that only successful refreshes or counted towards the maximum of eight per day


Status: New