Supplies are limited. Contact info@espc.tech right away to save your spot before the conference sells out.
Get your discountScore big with last-minute savings on the final tickets to FabCon Vienna. Secure your discount
Each time an applied step is added or modified in a Gen2 dataflow the entire project logic is being refreshed.
This absolutely kills productivity.
For example, if I have 20 fields that I need to rename, my project forces me to wait between each rename step to refresh its data.
If it takes a minute to refresh (which is not atypical), there goes 20 minutes of my day - for a step that should take me about a minute.
Please provide some kind of control to allow the user to make this manual.
This would be analogous to Excel's 'Calculation Options > Manual' feature
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.