Join us for an expert-led overview of the tools and concepts you'll need to pass exam PL-300. The first session starts on June 11th. See you there!
Get registeredCustom Visuals Ideas will be in read-only beginning Friday, Feb. 28 as we prepare to move these ideas to the new Fabric Ideas.
It would be so nice if powerbi.com settings for Scheduled refresh of datasets could be opened up, to not only run at the clock xx:00 and xx:30. and instead maybe be able to be set in 5 min. intervals.
So if you now the datasource will always be ready at 12:04 it very annoying you have to wait until 12:30 before the dateset updates.
So either a 5 min. interval, or even better, 1 min. interval in the options. Must also minimize load for powerbi server not having to run all loads at the very same time?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.