Get certified for free when you join Fabric Data Days 2026 and dive into Fabric, Power BI, SQL, AI, and other essential data skills.
Join nowData Days is here! Join us now for 60+ days of learning, challenges, and connection. Learn more
I have used Sharepoint list as data connector and switched on the schedular on daily basis.
Now I need a report data or partcular visual data has to export automatically before my scheduling time .
Need help to know is there any automaric export mechanism avaliable in power BI or is there any mechanism to get the data before refresh in scheduled time
Solved! Go to Solution.
@Anonymous there's way to make an aumatic flows into power bi, read this article and i hope that will help you, this is show you about the integration with microsoft flow, but is possible to do a lot of thing using this tool integrated with power bi.
https://docs.microsoft.com/pt-br/power-bi/service-flow-integration
Don't forget to mark this response as solution if you take it, okay?
@Anonymous there's way to make an aumatic flows into power bi, read this article and i hope that will help you, this is show you about the integration with microsoft flow, but is possible to do a lot of thing using this tool integrated with power bi.
https://docs.microsoft.com/pt-br/power-bi/service-flow-integration
Don't forget to mark this response as solution if you take it, okay?
Don't miss out on Data Days, June 15 through August 7. Learn Fabric, Power BI, SQL, AI and more.
Check out the May 2026 Power BI update to learn about new features.
| User | Count |
|---|---|
| 16 | |
| 10 | |
| 10 | |
| 8 | |
| 7 |
| User | Count |
|---|---|
| 40 | |
| 36 | |
| 34 | |
| 28 | |
| 20 |