Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

July 7 - July 17 | Round 2 of the Power BI Dataviz World Championships. Don't miss your chance! Learn more

Reply
Anonymous
Not applicable

DM_GWPipeline_UnknownError for initial refresh while setting up incremental refresh

Hi,

I am encountering an questionable issue while setting up the incremental refresh.

My setup: connecting powerbi to Azure cosmosDB, total records is 1million rows, incremental refresh for 10 archieved year and 2 days of incremental refresh. The data connection is via a virtual gateway.

After publishing the model to powerbi service and refresh for the first time, this error is shown: {"error":{"code":"DM_GWPipeline_UnknownError","pbi.error":{"code":"DM_GWPipeline_UnknownError","parameters":{},"details":[]}}

The error is shown after 15-20 minutes of running.

One weird thing is that, out of 10 attempts, around 3-4 times are successful. 

anyone knows how to fix this?

Thank you,

1 ACCEPTED SOLUTION
mohitkumawat
Impactful Individual
Impactful Individual

Hi @Anonymous 

maybe this error coming due to capacity throttling at that time when it fails you can check below points 

 

  • Optimize Cosmos DB queries and ensure partitioning is efficient to avoid long-running operations.
  • Reduce data load or adjust refresh policies to prevent timeout issues; ensure query folding is working.
  • Analyze Power BI and Cosmos DB logs for detailed error diagnostics to pinpoint the root cause.

 

View solution in original post

1 REPLY 1
mohitkumawat
Impactful Individual
Impactful Individual

Hi @Anonymous 

maybe this error coming due to capacity throttling at that time when it fails you can check below points 

 

  • Optimize Cosmos DB queries and ensure partitioning is efficient to avoid long-running operations.
  • Reduce data load or adjust refresh policies to prevent timeout issues; ensure query folding is working.
  • Analyze Power BI and Cosmos DB logs for detailed error diagnostics to pinpoint the root cause.

 

Helpful resources

Announcements
FabCon and SQLCon Barcelona 2026

FabCon & SQLCon – Barcelona 2026

Join us in Barcelona for FabCon and SQLCon, the Fabric, Power BI, SQL, and AI community event. Save €200 with code FABCMTY200.

60 days of Data Days Carousel

Data Days 2026

Join Fabric Data Days 2026: 60 days of free live/on-demand sessions, challenges, study groups, and certification opportunities.

Power BI DataViz World Championships carousel

Power BI DataViz World Championships - June 2026

A new Power BI DataViz World Championship is coming this June! Don't miss out on submitting your entry.