I encounter difficulty with total calculation. I have a table where each Jira issue is assigned to a Team and a Sprint. Each sprint has a start date and end date. If an issue is solved before the sprint end date, the issue is considered completed on time. I need to add up the story points of all the issues solved on time. Below is the Dax measure I created:
For some reason the total line of story_points_completed(M) is not correct. I should have 407 points completed (i.e., sum of each spint line), but Power BI gives me 712.5 instead.
Thanks for help!
*******************
Solved! Go to Solution.
I finally got it right! Here is the correct formula and toal amount matches now. The previous measure didn't work because I thought by using values() , I created a virtual table which is automatically linked to the fact table for filtering purpose. There is no relationship between the virtual table and fact table, so I need to quote the filter context explicitly in my filter condition.
I finally got it right! Here is the correct formula and toal amount matches now. The previous measure didn't work because I thought by using values() , I created a virtual table which is automatically linked to the fact table for filtering purpose. There is no relationship between the virtual table and fact table, so I need to quote the filter context explicitly in my filter condition.
Hi,
Share the link from where i can download your PBI file.
hi @Jeanxyz
try like:
This won't work because each sprint has its unique start date and end date. This needs to be taken into consideration.