Explore and share Fabric Notebooks to boost Power BI insights in the new community notebooks gallery.
Check it out now!Microsoft is giving away 50,000 FREE Microsoft Certification exam vouchers. Get Fabric certified for FREE! Learn more
I encounter difficulty with total calculation. I have a table where each Jira issue is assigned to a Team and a Sprint. Each sprint has a start date and end date. If an issue is solved before the sprint end date, the issue is considered completed on time. I need to add up the story points of all the issues solved on time. Below is the Dax measure I created:
For some reason the total line of story_points_completed(M) is not correct. I should have 407 points completed (i.e., sum of each spint line), but Power BI gives me 712.5 instead.
Thanks for help!
*******************
Solved! Go to Solution.
I finally got it right! Here is the correct formula and toal amount matches now. The previous measure didn't work because I thought by using values() , I created a virtual table which is automatically linked to the fact table for filtering purpose. There is no relationship between the virtual table and fact table, so I need to quote the filter context explicitly in my filter condition.
I finally got it right! Here is the correct formula and toal amount matches now. The previous measure didn't work because I thought by using values() , I created a virtual table which is automatically linked to the fact table for filtering purpose. There is no relationship between the virtual table and fact table, so I need to quote the filter context explicitly in my filter condition.
Hi,
Share the link from where i can download your PBI file.
hi @Jeanxyz
try like:
This won't work because each sprint has its unique start date and end date. This needs to be taken into consideration.