Auto exist import error

I am trying to import data from Analysis Services. However I get the "Auto exist operation is exceeding permitted limit" when importing several data tables. Traditionally these tables exist in a cube but when if I connect direct, I have essentially 0 functionality within power BI. Is there any advice? I know what I am important is in reality a small file as excel goes (maybe 50k rows tops)

1 ACCEPTED SOLUTION

@Anonymous to be honest, in my experience but i could be wrong that is to do with a cube that has been  badly modelled potentially  or you have a lot of dimensions that are very wide, with lots of columns,  I recommend understanding memory, you need to view your task manager and see how much memory is being used.  Do you need all the data in the cube, im talking from a field perspective rather than rows (range of data)





If I took the time to answer your question and I came up with a solution, please mark my post as a solution and /or give kudos freely for the effort 🙂 Thank you!

Proud to be a Super User!




View solution in original post

3 REPLIES 3
vanessafvg
Super User
Super User

@Anonymous have you tried to maybe limit the amount you bringing in just to test if its a memory issue?  do you watch your memory ?  have you also enabled tracing to see what that says?





If I took the time to answer your question and I came up with a solution, please mark my post as a solution and /or give kudos freely for the effort 🙂 Thank you!

Proud to be a Super User!




Anonymous
Not applicable

I do not know how to watch my memory or do tracking. However i have tried to limit the data I bring in and it works. The challenge is I have to limit the data to such a paltry amount that doing so is not viable

@Anonymous to be honest, in my experience but i could be wrong that is to do with a cube that has been  badly modelled potentially  or you have a lot of dimensions that are very wide, with lots of columns,  I recommend understanding memory, you need to view your task manager and see how much memory is being used.  Do you need all the data in the cube, im talking from a field perspective rather than rows (range of data)





If I took the time to answer your question and I came up with a solution, please mark my post as a solution and /or give kudos freely for the effort 🙂 Thank you!

Proud to be a Super User!




Helpful resources

Announcements
Power BI DataViz World Championships

Power BI Dataviz World Championships

The Power BI Data Visualization World Championships is back! Get ahead of the game and start preparing now!

December 2025 Power BI Update Carousel

Power BI Monthly Update - December 2025

Check out the December 2025 Power BI Holiday Recap!

FabCon Atlanta 2026 carousel

FabCon Atlanta 2026

Join us at FabCon Atlanta, March 16-20, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.

Top Solution Authors