Get certified for free when you join Fabric Data Days 2026 and dive into Fabric, Power BI, SQL, AI, and other essential data skills.
Join nowData Days is here! Join us now for 60+ days of learning, challenges, and connection. Learn more
Hi Guys,
In new to PowerBI and trying some stuff. Hopefully someone can help with with my problem.
I want to create a visual that shows if my projects passed their deadline date. I don't know if i need to create a new table or column of make a new measure.
- I have projects connected to Batch numbers already
- Deadline date connected to Batch number i don't have (How do i do this for only 3 Batches en remove the multiples?)
- Actual dates of the projects i do have already
- Show when the projects (divided in batches are passed the deadline batch date)
I hope my question is clear and someone can help me.
Kind Regards,
Baltabek
What visual type do you have in mind? Would a Gantt Chart visual be appropriate?
Hi,
Thanks for answering.
I'd prefer a pie chart that shows if the actual date exceeds/ is in time/ or is really close to the deadline date. Than a table will show what projects are exceeding/ are on time or are close to the deadline date.
A pie chart? How would that look like?
Don't miss out on Data Days, June 15 through August 7. Learn Fabric, Power BI, SQL, AI and more.
Check out the May 2026 Power BI update to learn about new features.
| User | Count |
|---|---|
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |