Hi Guys,
In new to PowerBI and trying some stuff. Hopefully someone can help with with my problem.
I want to create a visual that shows if my projects passed their deadline date. I don't know if i need to create a new table or column of make a new measure.
- I have projects connected to Batch numbers already
- Deadline date connected to Batch number i don't have (How do i do this for only 3 Batches en remove the multiples?)
- Actual dates of the projects i do have already
- Show when the projects (divided in batches are passed the deadline batch date)
I hope my question is clear and someone can help me.
Kind Regards,
Baltabek
What visual type do you have in mind? Would a Gantt Chart visual be appropriate?
Hi,
Thanks for answering.
I'd prefer a pie chart that shows if the actual date exceeds/ is in time/ or is really close to the deadline date. Than a table will show what projects are exceeding/ are on time or are close to the deadline date.
A pie chart? How would that look like?