Join us for an expert-led overview of the tools and concepts you'll need to pass exam PL-300. The first session starts on June 11th. See you there!
Get registeredPower BI is turning 10! Let’s celebrate together with dataviz contests, interactive sessions, and giveaways. Register now.
Hi Guys,
In new to PowerBI and trying some stuff. Hopefully someone can help with with my problem.
I want to create a visual that shows if my projects passed their deadline date. I don't know if i need to create a new table or column of make a new measure.
- I have projects connected to Batch numbers already
- Deadline date connected to Batch number i don't have (How do i do this for only 3 Batches en remove the multiples?)
- Actual dates of the projects i do have already
- Show when the projects (divided in batches are passed the deadline batch date)
I hope my question is clear and someone can help me.
Kind Regards,
Baltabek
What visual type do you have in mind? Would a Gantt Chart visual be appropriate?
Hi,
Thanks for answering.
I'd prefer a pie chart that shows if the actual date exceeds/ is in time/ or is really close to the deadline date. Than a table will show what projects are exceeding/ are on time or are close to the deadline date.
A pie chart? How would that look like?
This is your chance to engage directly with the engineering team behind Fabric and Power BI. Share your experiences and shape the future.
Check out the June 2025 Power BI update to learn about new features.