Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

Level up your Power BI skills this month - build one visual each week and tell better stories with data! Get started

Reply
Anonymous
Not applicable

scheuling

I have used Sharepoint list as data connector  and switched on the schedular on daily basis.

Now I need a report data or partcular visual data has to export automatically before my scheduling time .

Need help to know is there any automaric export mechanism avaliable in power BI or is there  any mechanism to get the data  before refresh in scheduled time

 

1 ACCEPTED SOLUTION
henriquesilveir
Resolver IV
Resolver IV

@Anonymous there's way to make an aumatic flows into power bi, read this article and i hope that will help you, this is show you about the integration with microsoft flow, but is possible to do a lot of thing using this tool integrated with power bi.

 

https://docs.microsoft.com/pt-br/power-bi/service-flow-integration

 

Don't forget to mark this response as solution if you take it, okay? 

View solution in original post

2 REPLIES 2
henriquesilveir
Resolver IV
Resolver IV

@Anonymous there's way to make an aumatic flows into power bi, read this article and i hope that will help you, this is show you about the integration with microsoft flow, but is possible to do a lot of thing using this tool integrated with power bi.

 

https://docs.microsoft.com/pt-br/power-bi/service-flow-integration

 

Don't forget to mark this response as solution if you take it, okay? 

Anonymous
Not applicable

thanks for your response.
So far we can create alerts  only on numeric data.
I have a pie chart cretaed using both calculated feild(dimension and measure)
This data has to automatically export or email notification should come before my schedular runs
 
 
 

Helpful resources

Announcements
April Power BI Update Carousel

Power BI Monthly Update - April 2026

Check out the April 2026 Power BI update to learn about new features.

Fabric SQL PBI Data Days

Data Days 2026 coming soon!

Sign up to receive a private message when registration opens and key events begin.

New to Fabric survey Carousel

New to Fabric Survey

If you have recently started exploring Fabric, we'd love to hear how it's going. Your feedback can help with product improvements.

Power BI DataViz World Championships carousel

Power BI DataViz World Championships - June 2026

A new Power BI DataViz World Championship is coming this June! Don't miss out on submitting your entry.