Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

Join the FabCon + SQLCon recap series. Up next: Power BI, Real-Time Intelligence, IQ and AI, and Data Factory take center stage. All sessions are available on-demand after the live show. Register now

Reply
jesuslogmein
Helper I
Helper I

Problems with data update

Hello!

We work with PBI with premium capabilities.

We have reports in a work space with scheduled updates every 30 minutes.

The problem is that they are connected to a DB that updates every 30 minutes. This DB takes 5 minutes to finish loading.
The scheduled update of the report takes less time than it takes my DB to finish loading and therefore we don't see all the data in the report because the updates overlap.
E.g.


My DB updates at 9.30h and takes 5 minutes to load data.
My report updates at 9.30h and takes 3 minutes to finish updating, there is a difference of 2 minutes and we lose data.

How can we solve this? We can't delay the GDP update to another time slot.

Is there any way to control the scheduled update time and instead of scheduling it at 9.30/10.00/10.30 put it at 9.40h/10:10/10.40?

 

1 ACCEPTED SOLUTION
lbendlin
Super User
Super User

Absolutely.  You can initiate dataset refreshes from Power Automate.  Power Automate has its own scheduler. 

 

Alternatively you can do this from Powershell and use the standard Task Scheduler  (if you have a PC or VM that is always on)

 

What would be even better is if your upstream system (the database) had a way to signal when it is done updating. You could then use that as the trigger for the refres hrequest - no scheduler required at all.

View solution in original post

1 REPLY 1
lbendlin
Super User
Super User

Absolutely.  You can initiate dataset refreshes from Power Automate.  Power Automate has its own scheduler. 

 

Alternatively you can do this from Powershell and use the standard Task Scheduler  (if you have a PC or VM that is always on)

 

What would be even better is if your upstream system (the database) had a way to signal when it is done updating. You could then use that as the trigger for the refres hrequest - no scheduler required at all.

Helpful resources

Announcements
April Power BI Update Carousel

Power BI Monthly Update - April 2026

Check out the April 2026 Power BI update to learn about new features.

New to Fabric survey Carousel

New to Fabric Survey

If you have recently started exploring Fabric, we'd love to hear how it's going. Your feedback can help with product improvements.

Power BI DataViz World Championships carousel

Power BI DataViz World Championships - June 2026

A new Power BI DataViz World Championship is coming this June! Don't miss out on submitting your entry.

FabCon and SQLCon Highlights Carousel

FabCon &SQLCon Highlights

Experience the highlights from FabCon & SQLCon, available live and on-demand starting April 14th.