Don't miss your chance to take the Fabric Data Engineer (DP-600) exam for FREE! Find out how by watching the DP-600 session on-demand now through April 28th.
Learn moreJoin the FabCon + SQLCon recap series. Up next: Power BI, Real-Time Intelligence, IQ and AI, and Data Factory take center stage. All sessions are available on-demand after the live show. Register now
Hello!
We work with PBI with premium capabilities.
We have reports in a work space with scheduled updates every 30 minutes.
The problem is that they are connected to a DB that updates every 30 minutes. This DB takes 5 minutes to finish loading.
The scheduled update of the report takes less time than it takes my DB to finish loading and therefore we don't see all the data in the report because the updates overlap.
E.g.
My DB updates at 9.30h and takes 5 minutes to load data.
My report updates at 9.30h and takes 3 minutes to finish updating, there is a difference of 2 minutes and we lose data.
How can we solve this? We can't delay the GDP update to another time slot.
Is there any way to control the scheduled update time and instead of scheduling it at 9.30/10.00/10.30 put it at 9.40h/10:10/10.40?
Solved! Go to Solution.
Absolutely. You can initiate dataset refreshes from Power Automate. Power Automate has its own scheduler.
Alternatively you can do this from Powershell and use the standard Task Scheduler (if you have a PC or VM that is always on)
What would be even better is if your upstream system (the database) had a way to signal when it is done updating. You could then use that as the trigger for the refres hrequest - no scheduler required at all.
Absolutely. You can initiate dataset refreshes from Power Automate. Power Automate has its own scheduler.
Alternatively you can do this from Powershell and use the standard Task Scheduler (if you have a PC or VM that is always on)
What would be even better is if your upstream system (the database) had a way to signal when it is done updating. You could then use that as the trigger for the refres hrequest - no scheduler required at all.
Check out the April 2026 Power BI update to learn about new features.
If you have recently started exploring Fabric, we'd love to hear how it's going. Your feedback can help with product improvements.
A new Power BI DataViz World Championship is coming this June! Don't miss out on submitting your entry.
| User | Count |
|---|---|
| 10 | |
| 10 | |
| 9 | |
| 7 | |
| 7 |
| User | Count |
|---|---|
| 41 | |
| 31 | |
| 26 | |
| 19 | |
| 19 |