Hello,
we use to embed live data from the PBI reports into our PowerPoint presentations. However we noticed that sometimes when there is a change in the original PBI report (i.e. filter change on a visual) it's not always picked up by the embedded version in the PowerPoint.
I could not find any patern. Sometimes the changes are inherited and sometimes not. Even if I force reload of the page. This is very annoying as requires to re-embed the PBI page once again.
The expected behavior is that the PBI embeded into the PowerPoint should inherit always the latest view and structure of the connected PBI report.
Any idea how to fix it?
Thanks in advance
Alena