Forum Discussion
Problem with Scheduled Refresh on PowerBI Report Server
Hello,
I'm trying to create a scheduled refresh plan in PowerBI Report Server using:
- PowerBI Desktop optimized for Report Server (September 2019)
- PowerBI Report Server (September 2019)
To test this, I've created a Test directory, to which I have full permissions. The same user has System Administrator and System User permissions in the Site Settings.
When I test the connection it seems ok. but when I try to set up a shceduled refresh it give me an error:
An error has occurred. Something went wrong. Please try again later.
I have checked in the log folder (C:\Program Files\Microsoft Power BI Report Server\PBIRS\LogFiles), but I don't know which log files to check, there a lof of types:
ReportingServicesService_XXX
ReportingServicesWMI_XXX
RSHostingService_XXX
RSManagement_XXX
RSOffice_XXX
RSPortal__XXX
RSPowerBI_XXX
I use local CSV file for the test, located in C:\ and shared as i read that it should be, so it can be accessed from \\servername\folder\test.csv
When I test the connection to the file - it is ok:
And here is the error when try to set up the Scheduled Refresh:
I can give you log file, but please tell me which one to copy.
Please help me with this issue.
BR