reverse-engineer a data table - amend the data source by adjusting visuals on the chart

Is there a way to change the data in the source from controls on the chart? For example, drag the top of one of bars in the chart, and the data table is adjusted accordingly? Or move a sector in pie-chart, and the underlying data is adjusted accordingly... in other words, reverse engineer the data table based on the desired look of the chart.

 

The practical application for us, is to allow users to allocate their time in the time-sheet based on relative size of the bars for the specific projects. Probably asking for too much, but thought it is worth asking.

1 ACCEPTED SOLUTION
Eric_Zhang
Microsoft Employee
Microsoft Employee


@Elnur wrote:

Is there a way to change the data in the source from controls on the chart? For example, drag the top of one of bars in the chart, and the data table is adjusted accordingly? Or move a sector in pie-chart, and the underlying data is adjusted accordingly... in other words, reverse engineer the data table based on the desired look of the chart.

 

The practical application for us, is to allow users to allocate their time in the time-sheet based on relative size of the bars for the specific projects. Probably asking for too much, but thought it is worth asking.


@Elnur

It is not possible. The charts in reports are based on the underlying data tables, not reverse-engineer unfortunately. You can only model data via DAX or PowerQuery.

View solution in original post

1 REPLY 1
Eric_Zhang
Microsoft Employee
Microsoft Employee


@Elnur wrote:

Is there a way to change the data in the source from controls on the chart? For example, drag the top of one of bars in the chart, and the data table is adjusted accordingly? Or move a sector in pie-chart, and the underlying data is adjusted accordingly... in other words, reverse engineer the data table based on the desired look of the chart.

 

The practical application for us, is to allow users to allocate their time in the time-sheet based on relative size of the bars for the specific projects. Probably asking for too much, but thought it is worth asking.


@Elnur

It is not possible. The charts in reports are based on the underlying data tables, not reverse-engineer unfortunately. You can only model data via DAX or PowerQuery.

Helpful resources

Announcements
New to Fabric survey Carousel

New to Fabric Survey

If you have recently started exploring Fabric, we'd love to hear how it's going. Your feedback can help with product improvements.

Power BI DataViz World Championships carousel

Power BI DataViz World Championships - June 2026

A new Power BI DataViz World Championship is coming this June! Don't miss out on submitting your entry.

Join our Fabric User Panel

Join our Fabric User Panel

Share feedback directly with Fabric product managers, participate in targeted research studies and influence the Fabric roadmap.

March Power BI Update Carousel

Power BI Community Update - March 2026

Check out the March 2026 Power BI update to learn about new features.