Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

July 7 - July 17 | Round 2 of the Power BI Dataviz World Championships. Don't miss your chance! Learn more

Reply
Elnur
New Member

reverse-engineer a data table - amend the data source by adjusting visuals on the chart

Is there a way to change the data in the source from controls on the chart? For example, drag the top of one of bars in the chart, and the data table is adjusted accordingly? Or move a sector in pie-chart, and the underlying data is adjusted accordingly... in other words, reverse engineer the data table based on the desired look of the chart.

 

The practical application for us, is to allow users to allocate their time in the time-sheet based on relative size of the bars for the specific projects. Probably asking for too much, but thought it is worth asking.

1 ACCEPTED SOLUTION
Eric_Zhang
Microsoft Employee
Microsoft Employee


@Elnur wrote:

Is there a way to change the data in the source from controls on the chart? For example, drag the top of one of bars in the chart, and the data table is adjusted accordingly? Or move a sector in pie-chart, and the underlying data is adjusted accordingly... in other words, reverse engineer the data table based on the desired look of the chart.

 

The practical application for us, is to allow users to allocate their time in the time-sheet based on relative size of the bars for the specific projects. Probably asking for too much, but thought it is worth asking.


@Elnur

It is not possible. The charts in reports are based on the underlying data tables, not reverse-engineer unfortunately. You can only model data via DAX or PowerQuery.

View solution in original post

1 REPLY 1
Eric_Zhang
Microsoft Employee
Microsoft Employee


@Elnur wrote:

Is there a way to change the data in the source from controls on the chart? For example, drag the top of one of bars in the chart, and the data table is adjusted accordingly? Or move a sector in pie-chart, and the underlying data is adjusted accordingly... in other words, reverse engineer the data table based on the desired look of the chart.

 

The practical application for us, is to allow users to allocate their time in the time-sheet based on relative size of the bars for the specific projects. Probably asking for too much, but thought it is worth asking.


@Elnur

It is not possible. The charts in reports are based on the underlying data tables, not reverse-engineer unfortunately. You can only model data via DAX or PowerQuery.

Helpful resources

Announcements
FabCon and SQLCon Barcelona 2026

FabCon & SQLCon – Barcelona 2026

Join us in Barcelona for FabCon and SQLCon, the Fabric, Power BI, SQL, and AI community event. Save €200 with code FABCMTY200.

July Power BI Update Carousel

Power BI Monthly Update - July 2026

Check out the July 2026 Power BI update to learn about new features.

60 days of Data Days Carousel

Data Days 2026

Join Data Days 2026: 60 days of free live/on-demand sessions, challenges, study groups, and certification opportunities.

Power BI DataViz World Championships carousel

Power BI DataViz World Championships - June 2026

A new Power BI DataViz World Championship is coming this June! Don't miss out on submitting your entry.