Hi all
I want to create a running total chart for project planning showing the amount of work my team has done compared to budget. I have used the running total quick measure and have a date table.
However, the charts I've created show a flat line for the future. The easiest to show with a picture:
I want to be rid of the flat horizontal lines in this. Should I change my measure or is there a way to do this with the chart itself?
The measure formula is as follows:
value_scheduled running total in Month_Year = CALCULATE( SUM('timesheets 16-04 to 18-03'[value_scheduled]), FILTER( ALLSELECTED('Dates'[Month_Year]), ISONORAFTER('Dates'[Month_Year], MAX('Dates'[Month_Year]), DESC) ) )
Data Here:
Solved! Go to Solution.
Hi,
Try this for value_scheduled running total in Month_Year
=if(ISBLANK(SUM('timesheets 16-04 to 18-03'[value_scheduled])),BLANK(),CALCULATE( SUM('timesheets 16-04 to 18-03'[value_scheduled]), FILTER( ALLSELECTED('Dates'[Month_Year]), ISONORAFTER('Dates'[Month_Year], MAX('Dates'[Month_Year]), DESC) ) ))
Try this forvalue_worked running total in Month_Year
=if(ISBLANK(SUM('timesheets 16-04 to 18-03'[value_worked])),BLANK(),CALCULATE( SUM('timesheets 16-04 to 18-03'[value_worked]), FILTER( ALLSELECTED('Dates'[Month_Year]), ISONORAFTER('Dates'[Month_Year], MAX('Dates'[Month_Year]), DESC) ) ))
Hi,
Share the download link of your file.
Hi - do you mean the link to the data that I'm using, etc?
Thanks,
Sam
Yes. The download link of your .pbix file.
It contains commerically sensitive information. Is it standard to share all of the data one is working on?
Dummy the dataset.
Edited and added above.
Hi,
Try this for value_scheduled running total in Month_Year
=if(ISBLANK(SUM('timesheets 16-04 to 18-03'[value_scheduled])),BLANK(),CALCULATE( SUM('timesheets 16-04 to 18-03'[value_scheduled]), FILTER( ALLSELECTED('Dates'[Month_Year]), ISONORAFTER('Dates'[Month_Year], MAX('Dates'[Month_Year]), DESC) ) ))
Try this forvalue_worked running total in Month_Year
=if(ISBLANK(SUM('timesheets 16-04 to 18-03'[value_worked])),BLANK(),CALCULATE( SUM('timesheets 16-04 to 18-03'[value_worked]), FILTER( ALLSELECTED('Dates'[Month_Year]), ISONORAFTER('Dates'[Month_Year], MAX('Dates'[Month_Year]), DESC) ) ))
Perfect thanks - works an absolute charm.
Hi,
If my reply helped, please mark it as Answer.
March 31 - April 2, 2025, in Las Vegas, Nevada. Use code MSCUST for a $150 discount!
Arun Ulag shares exciting details about the Microsoft Fabric Conference 2025, which will be held in Las Vegas, NV.
User | Count |
---|---|
126 | |
85 | |
69 | |
53 | |
44 |
User | Count |
---|---|
204 | |
105 | |
99 | |
64 | |
54 |