Hi,
I've got the table below, and the orange header are my main data inside Power BI and the green headers are the first initial calculation.
Calcualtion I need to do in Power is:
W.F = Each Duration / Overall Duration of each project (Sum of durations)
W.F Per day = W.F / Duration
And then I want the "W.F per day" to be spread within the duration of each row, which give you the table below:
Which will give you the graphs below from the comulatives.
These are all on excel and I want this inside power BI please.
Can someone pelase help. Thank you!
The data table below for ease of use.
| Project ID | Start | Finish | Duration |
| A | 07/04/2025 | 09/04/2025 | 3 |
| A | 10/04/2025 | 21/04/2025 | 8 |
| A | 22/04/2025 | 28/04/2025 | 5 |
| A | 29/04/2025 | 30/04/2025 | 2 |
| B | 15/04/2025 | 18/04/2025 | 4 |
| B | 21/04/2025 | 25/04/2025 | 5 |
| B | 28/04/2025 | 30/04/2025 | 3 |
| B | 01/05/2025 | 02/05/2025 | 2 |
Solved! Go to Solution.
Your Duration column is not helping. Instead, use a filter that eliminates saturdays and sundays.
The Power BI Data Visualization World Championships is back! Get ahead of the game and start preparing now!
Check out the November 2025 Power BI update to learn about new features.
| User | Count |
|---|---|
| 59 | |
| 43 | |
| 42 | |
| 23 | |
| 17 |
| User | Count |
|---|---|
| 190 | |
| 122 | |
| 96 | |
| 66 | |
| 47 |