Supplies are limited. Contact info@espc.tech right away to save your spot before the conference sells out.
Get your discountScore big with last-minute savings on the final tickets to FabCon Vienna. Secure your discount
Hi All,
So I'm fairly new to Power BI, and I'm wondering why (for curiousity's sake more than anything) when using the Advanced Editor function in the Edit Queries screen, that the M code for a step always references the previous step.
e.g. #"Removed Columns3" = Table.RemoveColumns(#"Changed Type2",{"ExitResponse"}),
Where #"Changed Type2" is was the previous step.
This caused me a couple of trip ups when writing steps by hand, so some understanding of why it's doing it would be great to help me write better code.
Thanks!
Adam
because m is a procedural langauge, therefore it creates everything in steps. The last step is all the changes in the data to that point.
Proud to be a Super User!