Hi All,
I have a table loaded into PowerBI called 'Worklogs'. To make a complicated issue a bit simpler, the table looks something similar to this:
| Logged Time (Hours) | Project Key | Project Code |
| 0.5 | EQ-1 | EQ |
| 0.75 | EQ-1 | EQ |
| 1 | EQ-91 | EQ |
| 5 | EQ-418 | EQ |
| 5 | EQ-418 | EQ |
I want to create two more columns - one is a sum of all time logged against the Project Code EQ (as I do have other PCs in the table), and another would be a sum of all time logged against the Project Code EQ but excluding the Time Logged against Project Key EQ-418.
Is this possible? Should I be using the FILTER function or something else?
Thank you for any help in advance!
Solved! Go to Solution.
@FJH2024 for calculated columns
sum of all time logged against the Project Code EQ = CALCULATE(SUM('Table 1'[Logged Time (Hours)]),FILTER('Table 1','Table 1'[Project Code]="EQ"))
sum of all time logged against the Project Code EQ but excluding the Time Logged against Project Key EQ_418 = 'Table 1'[sum of all time logged against the Project Code EQ]-CALCULATE(SUM('Table 1'[Logged Time (Hours)]),FILTER('Table 1','Table 1'[Project Code]="EQ"&&'Table 1'[Project Key]="EQ-418"))
@FJH2024 for calculated columns
sum of all time logged against the Project Code EQ = CALCULATE(SUM('Table 1'[Logged Time (Hours)]),FILTER('Table 1','Table 1'[Project Code]="EQ"))
sum of all time logged against the Project Code EQ but excluding the Time Logged against Project Key EQ_418 = 'Table 1'[sum of all time logged against the Project Code EQ]-CALCULATE(SUM('Table 1'[Logged Time (Hours)]),FILTER('Table 1','Table 1'[Project Code]="EQ"&&'Table 1'[Project Key]="EQ-418"))
If you have recently started exploring Fabric, we'd love to hear how it's going. Your feedback can help with product improvements.
A new Power BI DataViz World Championship is coming this June! Don't miss out on submitting your entry.
Share feedback directly with Fabric product managers, participate in targeted research studies and influence the Fabric roadmap.
| User | Count |
|---|---|
| 57 | |
| 38 | |
| 33 | |
| 19 | |
| 16 |
| User | Count |
|---|---|
| 69 | |
| 66 | |
| 42 | |
| 32 | |
| 25 |