Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

Join the Fabric FabCon Global Hackathon—running virtually through Nov 3. Open to all skill levels. $10,000 in prizes! Register now.

Reply
Odn_ndO
Helper I
Helper I

Switching Determiner from Work Weeks to Days in Power BI Based on Date Input

Hi all, 

 

please help. seeking advise on the below.

 

I have set up my entire Power BI report to use work weeks as the primary determiner. However, when a specific work week is reached, I need the determiner to switch to days. The days should be determined based on the date input in the table. How can I implement this change in my Power BI report? A seperate page has been created but i am not able to get the desired results.

1 REPLY 1
lbendlin
Super User
Super User

Use a calendar table that includes the work week column.  Add both that column and the Date column to the standard slicer. It will automatically create the hierarchy for you.

Helpful resources

Announcements
September Power BI Update Carousel

Power BI Monthly Update - September 2025

Check out the September 2025 Power BI update to learn about new features.

FabCon Atlanta 2026 carousel

FabCon Atlanta 2026

Join us at FabCon Atlanta, March 16-20, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.

Top Solution Authors