Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!Learn from the best! Meet the four finalists headed to the FINALS of the Power BI Dataviz World Championships! Register now
Hi Community,
When I change a slicer on the page level of a given report I wan't the grap visualization x axisis to follow this, but can't get it to work.
I'm using Azure DevOps (ADO) and their analytics tool - great!
I'm working Scrum like.
But I face some problemes with the visuals in the graphs is changed from a slicer change. The slicer is set to Iteration path.
When I manually try to bind values to the given graph visual, then I have to manually set the to and from date - I didn't find a way to bind these values a column/row in my table.
Do you have a good advise to fix this?
Please let me now if the location of this post is wrong,l so it can be posted in the correct channel 🙂
BR and Merry Christmas
/Michael
Solved! Go to Solution.
I suggest to ask in Desktop thread.
Ignat Vilesov,
Software Engineer
Microsoft Power BI Custom Visuals
I suggest to ask in Desktop thread.
Ignat Vilesov,
Software Engineer
Microsoft Power BI Custom Visuals
Thanks I've moved this to the Desktop tread
Share feedback directly with Fabric product managers, participate in targeted research studies and influence the Fabric roadmap.
Check out the February 2026 Power BI update to learn about new features.