Power BI is turning 10! Tune in for a special live episode on July 24 with behind-the-scenes stories, product evolution highlights, and a sneak peek at what’s in store for the future.
Save the dateEnhance your career with this limited time 50% discount on Fabric and Power BI exams. Ends August 31st. Request your voucher.
Hi Community,
When I change a slicer on the page level of a given report I wan't the grap visualization x axisis to follow this, but can't get it to work.
I'm using Azure DevOps (ADO) and their analytics tool - great!
I'm working Scrum like.
But I face some problemes with the visuals in the graphs is changed from a slicer change. The slicer is set to Iteration path.
When I manually try to bind values to the given graph visual, then I have to manually set the to and from date - I didn't find a way to bind these values a column/row in my table.
Do you have a good advise to fix this?
Please let me now if the location of this post is wrong,l so it can be posted in the correct channel 🙂
BR and Merry Christmas
/Michael
Solved! Go to Solution.
I suggest to ask in Desktop thread.
Ignat Vilesov,
Software Engineer
Microsoft Power BI Custom Visuals
I suggest to ask in Desktop thread.
Ignat Vilesov,
Software Engineer
Microsoft Power BI Custom Visuals
Thanks I've moved this to the Desktop tread