Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

The Power BI Data Visualization World Championships is back! Get ahead of the game and start preparing now! Learn more

Reply
Peter_23
Post Patron
Post Patron

Deployment pipelines

Hi community , in this time, I would like to know if there is a way to rollback a deployment pipeline?

I mean. I have a 1SM and 1 report A to deploy from devel to test enviroment, but I have to restoration a previous version en test. before the deploy pipeline it had made. 

e.g. Deploy devel -> test it going to previous version test -> devel

 

 

thanks in advance.

1 ACCEPTED SOLUTION
v-hashadapu
Community Support
Community Support

Hi @Peter_23 , Thank you for reaching out to the Microsoft Community Forum.

 

In Microsoft Fabric Deployment Pipelines, there is no built-in rollback button. However, you can restore a previous version of your semantic model and Report A in the Test environment using several methods, depending on how your environment is set up.

 

If your workspace is Git-enabled, roll back by syncing to a previous commit or tag using the Source Control pane, this is the most reliable and version-controlled option. If Git isn’t enabled but the Dev workspace still contains the older version, redeploy from Dev to Test through the deployment pipeline. If Dev has already been updated but you saved a .pbix or .pbip backup, re-upload it to Dev and redeploy to Test.

 

If none of these apply, and only the report needs rollback, restore it through version history; otherwise, you'll need to manually rebuild the semantic model. Going forward, enable Git integration, export your Power BI files before every deployment, and apply deployment rules to minimize the need for future rollbacks.

 

If this helped solve the issue, please consider marking it 'Accept as Solution' so others with similar queries may find it more easily. If not, please share the details, always happy to help.
Thank you.

View solution in original post

3 REPLIES 3
v-hashadapu
Community Support
Community Support

Hi @Peter_23 , Thank you for reaching out to the Microsoft Community Forum.

 

In Microsoft Fabric Deployment Pipelines, there is no built-in rollback button. However, you can restore a previous version of your semantic model and Report A in the Test environment using several methods, depending on how your environment is set up.

 

If your workspace is Git-enabled, roll back by syncing to a previous commit or tag using the Source Control pane, this is the most reliable and version-controlled option. If Git isn’t enabled but the Dev workspace still contains the older version, redeploy from Dev to Test through the deployment pipeline. If Dev has already been updated but you saved a .pbix or .pbip backup, re-upload it to Dev and redeploy to Test.

 

If none of these apply, and only the report needs rollback, restore it through version history; otherwise, you'll need to manually rebuild the semantic model. Going forward, enable Git integration, export your Power BI files before every deployment, and apply deployment rules to minimize the need for future rollbacks.

 

If this helped solve the issue, please consider marking it 'Accept as Solution' so others with similar queries may find it more easily. If not, please share the details, always happy to help.
Thank you.

thanks @v-hashadapu  complete answer. I have to rebuild manually :(.

 

 

lbendlin
Super User
Super User

Helpful resources

Announcements
Power BI DataViz World Championships

Power BI Dataviz World Championships

The Power BI Data Visualization World Championships is back! Get ahead of the game and start preparing now!

December 2025 Power BI Update Carousel

Power BI Monthly Update - December 2025

Check out the December 2025 Power BI Holiday Recap!

FabCon Atlanta 2026 carousel

FabCon Atlanta 2026

Join us at FabCon Atlanta, March 16-20, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.