I'm trying to see if there's a way to run a refresh of a single report that fails on a shared schedule. Basically trying to avoid running all the other reports that are attached to the same schedule. I have some TSQL that gives me the GUID of the failed report, but not sure to run the refresh.
Thanks
Solved! Go to Solution.
@Anonymous - Should be able to use Power Automate for that (Flow).
@Anonymous - Should be able to use Power Automate for that (Flow).
I haven't used that yet, but I'll give it a shot.
Thanks
Would this work with an on premise Report Server?