Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!Calling all Data Engineers! Fabric Data Engineer (Exam DP-700) live sessions are back! Starting October 16th. Sign up.
Is the Change Control data in Project Online available to be used in a PowerBi report? I can pull in the Project Online data using the OData connector. However, I do not see the Change Control data.
Solved! Go to Solution.
Hi @jakeday ,
What do you mean by Change Control data? Are you saying Change Control process?
What Is a Change Control Process? (with Example Change Log) [2024] • Asana
I'm not familiar with Project Online, but by Power BI's standards for fetching data, it should only fetch what's in your datasheet in Project Online, and the Change Control process is just a change request process, which shouldn't be part of the datasheet's contents per se, so it shouldn't be imported into the Power BI.
Best Regards,
Dino Tao
If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.
Hi @jakeday ,
What do you mean by Change Control data? Are you saying Change Control process?
What Is a Change Control Process? (with Example Change Log) [2024] • Asana
I'm not familiar with Project Online, but by Power BI's standards for fetching data, it should only fetch what's in your datasheet in Project Online, and the Change Control process is just a change request process, which shouldn't be part of the datasheet's contents per se, so it shouldn't be imported into the Power BI.
Best Regards,
Dino Tao
If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.
Join the Fabric FabCon Global Hackathon—running virtually through Nov 3. Open to all skill levels. $10,000 in prizes!
Check out the September 2025 Power BI update to learn about new features.