Get certified for free when you join Fabric Data Days 2026 and dive into Fabric, Power BI, SQL, AI, and other essential data skills.
Join nowData Days is here! Join us now for 60+ days of learning, challenges, and connection. Learn more
i have four pipelines running in 2 streams.
each stream has 2 pipelines running in sequence.
if a pipeline fails then the next pipeline should not get executed.
However, this should not affect the one's running in parallel and they should continue.
Final status of the pipeline should be Failed.
Solved! Go to Solution.
A and C run in parallel
Any Dependencies should i consider for this
Above is the dependecy flow wherein the 2 pipelines should be dependant via on Success
Hi, parallel pipelines within the same pipeline already work without being affected by each other. Even if one of them fails, the other pipelines will work, but the main pipeline will return a failure.
im looking for a design , if my above ask is possible or not in ms fabric
Master Pipeline:
├── Pipeline A (Runs in parallel)
│ └── Pipeline B (Runs only if A succeeds)
├── Pipeline C (Runs in parallel)
└── Pipeline D (Runs only if C succeeds)
A and C run in parallel
please provide a pictorial represent of your ask as that would be much more clearer rather than the above statements.
meaning when you say if a pipeline fails, is it the pipeline within the stream or the external pipeline etc?