Hi,

 

It takes us a long time to redresh using odata connection, and using the scheduled refresh shows error: time out

Tried to resolve it by using incremental refresh and didnt work. 

Is there a solution how to increase or cancelled the time limit of the refresh? 

 

Thanks

 

 

1 ACCEPTED SOLUTION
Anonymous
Not applicable

Hi @prioritybi,

How long did the timeout issue appear? If they do not exceed the maximum timeout settings, you can change the timeout property in your query to increase the processing times.

Troubleshooting refresh scenarios - Power BI | Microsoft Docs

Scheduled refresh timeout
Scheduled refresh for imported datasets timeout after two hours. This timeout is increased to five hours for datasets in Premium workspaces. If you encounter this limit, consider reducing the size or complexity of your dataset, or consider refactoring the large dataset into multiple smaller datasets.

If they are already over the limit, I think you need to upgrade your license to increase the maximum timeout of refresh processing or try to add query filters to reduce the loaded data amounts.

Regards,

Xiaoxin Sheng

View solution in original post

2 REPLIES 2
Anonymous
Not applicable

Hi @prioritybi,

How long did the timeout issue appear? If they do not exceed the maximum timeout settings, you can change the timeout property in your query to increase the processing times.

Troubleshooting refresh scenarios - Power BI | Microsoft Docs

Scheduled refresh timeout
Scheduled refresh for imported datasets timeout after two hours. This timeout is increased to five hours for datasets in Premium workspaces. If you encounter this limit, consider reducing the size or complexity of your dataset, or consider refactoring the large dataset into multiple smaller datasets.

If they are already over the limit, I think you need to upgrade your license to increase the maximum timeout of refresh processing or try to add query filters to reduce the loaded data amounts.

Regards,

Xiaoxin Sheng

Hariharan_R
Solution Sage
Solution Sage

Hi

Try change the timeout as like below mentioned.

Ref - https://forums.invantive.com/t/avoid-timeout-error-on-power-bi-odata-download/1857#how-do-i-change-t...

Thanks

Hari

Did I answer your question? Then please mark my post as the solution.
If I helped you, click on the Thumbs Up to give Kudos.


My Blog :: YouTube Channel :: My Linkedin


Helpful resources

Announcements
Join our Fabric User Panel

Join our Fabric User Panel

This is your chance to engage directly with the engineering team behind Fabric and Power BI. Share your experiences and shape the future.

June 2025 Power BI Update Carousel

Power BI Monthly Update - June 2025

Check out the June 2025 Power BI update to learn about new features.

June 2025 community update carousel

Fabric Community Update - June 2025

Find out what's new and trending in the Fabric community.