Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!The Power BI Data Visualization World Championships is back! It's time to submit your entry. Live now!
Hi,
This is a 2nd post on "Yield Bridge". Made some progress but need help to create the "Yield Bridge" Line that I need.
A Yield Bridge is similar to a pareto that both ranks the defects from high to low. But In addition, the yield bridge shows the "to-be" yield if the top defects are resolved.
Sample data. Need advice on how to create the column "Yield Bridge" (keeping the rank order of highest defect infront).
Hi @vincentakatoh,
You want to get the "Yield Bridge" highlighted in red line, I known 45.8%+27.78%=73.61%, 73.61%+16.67%=90.28%, 90.28%+9.72%=100% but how to get the first value 45.8% ? Could you please share more details?
Thanks,
Angelia
Hi @v-huizhn-msft,
45.8%= 33/(33+39) = Current Yield = (Total Good) / (Total defect +Total good).
The sample pbix and excel are in below link.
https://1drv.ms/f/s!ArjVwEnHONXNgSh_DLWrKczYek_x
Thanks,
vincent
The Power BI Data Visualization World Championships is back! It's time to submit your entry.
Check out the January 2026 Power BI update to learn about new features.
| User | Count |
|---|---|
| 66 | |
| 45 | |
| 38 | |
| 26 | |
| 23 |
| User | Count |
|---|---|
| 135 | |
| 119 | |
| 58 | |
| 37 | |
| 30 |