Power BI is turning 10! Tune in for a special live episode on July 24 with behind-the-scenes stories, product evolution highlights, and a sneak peek at what’s in store for the future.
Save the dateEnhance your career with this limited time 50% discount on Fabric and Power BI exams. Ends August 31st. Request your voucher.
Hello everyone,
the blue graphs are two workload curves (two projects) showing a peak which runs over the maximum capacity (may 23). i want to give the user the possibility to "shift single projects to the left and right by manipulating the dates in the connected table.
but the new column approach doesnt work so far and a measure cannot be used as x-axis value currently.
Does anybody know how to fix this (i hope rather simple) problem?
Thank you very much in advance!
David
@Dave_Delfino , Create a measure for the new date and then join it with the date table in measure, like dynamic segmentation
example
Dynamic segmentation -Measure to Dimension conversion: https://youtu.be/gzY40NWJpWQ
Customer Retention with Dynamic Segmentation, New/Lost/Retain Customer Count: https://youtu.be/EyL7KMw877Q
Good Morning Amit!
i watched your video but failed to understand how the segmentation impatcs my "dateadd" function.
i still try to shift a date-based column (dd.mm.yyyy) based on a selectedvalue from a parameter.
could you help me out and explain using a date-example?
Thank you in advance,
David
here is a screenshot of the (to beshifted) date column "work days" and the try to shift the dates "shifted project"
Check out the July 2025 Power BI update to learn about new features.
This is your chance to engage directly with the engineering team behind Fabric and Power BI. Share your experiences and shape the future.
User | Count |
---|---|
70 | |
68 | |
43 | |
34 | |
26 |
User | Count |
---|---|
88 | |
52 | |
45 | |
39 | |
38 |