Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

Join us for an expert-led overview of the tools and concepts you'll need to become a Certified Power BI Data Analyst and pass exam PL-300. Register now.

Reply
Anonymous
Not applicable

Source different in Devellopment and Production

I hae an excel file with a sheet  A and some data in it.

I have made a powerbi presentation of that data.

After publishing the powerbi file, I'v added more and more data in this excel-file. the refresh of the data in the service is working well, but it takes a lot of time (let's say 20minutes).  I don't see at this moment how I can optimize the calculation.

 

Now I have to change the type of powerbi presentation. (other kind of graphics, additional filtering, new tabs, ... à

I'm doing this adaptation in my devellopment environment and sometimes the file has to be refreshed. At that time I have to wait 20 minutes.

 

How can I devellop with a smaller source file (let say sheet B in the same excel file, smaller number of rows, but the same structure of sheet A), adjust my pbix-file, deploy it and then tell to the system that he need to use the sheet A.

 

Thanks in advance for any idea.

1 ACCEPTED SOLUTION
Greg_Deckler
Super User
Super User

Typically you would do something like that using a query parameter.



Follow on LinkedIn
@ me in replies or I'll lose your thread!!!
Instead of a Kudo, please vote for this idea
Become an expert!: Enterprise DNA
External Tools: MSHGQM
YouTube Channel!: Microsoft Hates Greg
Latest book!:
Power BI Cookbook Third Edition (Color)

DAX is easy, CALCULATE makes DAX hard...

View solution in original post

2 REPLIES 2
Greg_Deckler
Super User
Super User

Typically you would do something like that using a query parameter.



Follow on LinkedIn
@ me in replies or I'll lose your thread!!!
Instead of a Kudo, please vote for this idea
Become an expert!: Enterprise DNA
External Tools: MSHGQM
YouTube Channel!: Microsoft Hates Greg
Latest book!:
Power BI Cookbook Third Edition (Color)

DAX is easy, CALCULATE makes DAX hard...
Anonymous
Not applicable

I was thinking in the same direction 🙂

I hoped there was another way because I am new to the principe of query parameters

Meanwhile I'v figured it out how I can solve this issue!

 

 

Helpful resources

Announcements
Join our Fabric User Panel

Join our Fabric User Panel

This is your chance to engage directly with the engineering team behind Fabric and Power BI. Share your experiences and shape the future.

June 2025 Power BI Update Carousel

Power BI Monthly Update - June 2025

Check out the June 2025 Power BI update to learn about new features.

June 2025 community update carousel

Fabric Community Update - June 2025

Find out what's new and trending in the Fabric community.