Projecting Employee Retention

Hi I am looking to see if PowerBi has the capability to project future retention percentages based on previous 12 months retention. I am trying to forecast our employee retention rate for 2023. I'm not sure if I could create a measure to show this, or if it is even possible for PowerBi to forecast data. I have included a screenshot of the graph I currently have and would love to add a projection line to if possible. Thanks. 

 

4 Replies

  • Anonymous's avatar
    Anonymous
    Not applicable

    Yes its absolutely possible and easy. 

    The only caveat is that this can only be done on a single line chart - not the type that you have above. 
    1. Put your measure into single line chart -with a date formatted time column as the x-axis and your retention numbers as the y axis

    2. In the visualisation analytics pane, chose the third icon (magnifying glass). 

    3. Second from last option - Forecast - turn on

     

    Easy as that

    Accept this as the solution if this is what you wanted

    • benz-fsproduce's avatar
      benz-fsproduce
      Frequent Visitor

      Thanks for your help. The problem I'm now having is that it will not allow me to turn forecast on. I try to change it from off and it won't turn on. 

       

  • Anonymous's avatar
    Anonymous
    Not applicable

    There may be a problem with the Y-axis measure you are using - trying replacing it with some other measures/ columns and see if it turns on. 

    If thats the case, then you may need to do the following with your Retention %: 

    1. instead of using a percentage - use actual numbers

    2. Try unfiltering the dates in this graph - the limited number of years may not be enough for the algorithm to figure out a forecastable trend