Plotting an instantly changing status value (plot line with only vertical slope)

Hi all,

 

I would like to create a plot that displays the status of a device over time. The device sends updates containing its current status at random moments. A simple sample would look like this (mm:dd:yyyy: hh:mm:ss | value):

 

01-02-2022: 14:09:68 | 800

01-04-2022: 20:06:01 | 300

01-12-2022: 01:01:57 | 750

 

Since the status updates are instant changes, I would like to see that the plot contains only straight horizontal lines between the data points (so no slopes) and only vertical lines exactly on the X line of these datapoints (representing the instant change). Please excuse my drawing skills, but the graph should thus look somewhat like this: 

fabero_0-1655731685202.png

I cannot find a way to achieve this in PowerBI. Using a line diagram with timestamp on the X axis and the value on Y, while enabling 'interval' under the lines' shape settings somewhat gets me in the right direction, but the problem then is that the vertical lines are in the middle between two datapoints' X values, while they should be exactly on the X value of the datapoint (because the increase/decrease happens at exactly that moment). I am not sure what to search for in order to find a solution. Could anyone point me in the right direction?

 

Thanks in advance!

2 REPLIES 2
v-chenwuz-msft
Community Support
Community Support

Hi @fabero ,

 

Turn on Stepped as the following screenshot:

vchenwuzmsft_0-1655954218493.png

 

Best Regards

Community Support Team _ chenwu zhu

 

If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.

Hi,

 

Thank you for your reply. I have tried the 'Stepped' option, but unfortunately this does not produce the desired result. The problem is that this function creates a graph in which the increase and decline are placed in between the x coordinates of two datapoints, while this should happen exactly on top of these x coordinates (since the y value changes exactly at that moment and not somewhere else). Is there any other option to achieve this?

 

Helpful resources

Announcements
July PBI25 Carousel

Power BI Monthly Update - July 2025

Check out the July 2025 Power BI update to learn about new features.

Join our Fabric User Panel

Join our Fabric User Panel

This is your chance to engage directly with the engineering team behind Fabric and Power BI. Share your experiences and shape the future.

June 2025 community update carousel

Fabric Community Update - June 2025

Find out what's new and trending in the Fabric community.