Need to create the levels and should be expendable in Table or matrix

@Anonymous 
 
 

Hi, I am begnieer on Power BI so need complete command or screen shot. Thanks in advance.

 

Now what i need is.

1. Tasks should be sorted with the WBS like 1 at Top then 1.1 then 1.2 and so on if there is sub task like 1.1.1 or more 1.1.1.1

It should show as below

Level1(Task Name/Main Task/Project Name)

Level2(Task Name)

Level 3(Task Name)

Level 4(Task Name)

2. I don't have column which shows task level as 1,2,3,4,5, i only have WBS which is 1, 1.1, 1.1.1, 1.1.1.1 form

 

Here is screen shot how does it looks like as of now.

Current stateCurrent state

 

 

1 ACCEPTED SOLUTION

Sorry for the confusion!

The previous one will give the just value of the level. It won't give like 1 -> 1.1 -> 1.1.1

 

The below one will work as expected

Steps:

  1. Create calculated Column to measure the length
    • WBSLength = LEN('Table'[WBS])
  2. Create 4 columns for each level
    1. Level1 = IF( 'Table'[Length] >= 1, LEFT('Table'[WBS],1))
    2. Level2 = IF( 'Table'[Length] >= 3, LEFT('Table'[WBS],3))
    3. Level3 = IF( 'Table'[Length] >= 5, LEFT('Table'[WBS],5))
    4. Level4 = IF( 'Table'[Length] >= 7, LEFT('Table'[WBS],7))

 

 

View solution in original post

9 REPLIES 9
SivaMani
Resident Rockstar
Resident Rockstar

Thanks for mentioning me😉

 

Are you happy to extract the levels from your TaskWBS column?

 

You may need to create 4 columns in this case.

Yes that's fine, but help me to create that first

Alright!

Steps:

  1.  Go to Query Editor
  2. Duplicate WBS column 
  3. Replace dot(.) with '|' symbol
  4. Close and apply
  5. Create Calculated columns using PATHITEM() DAX function

Eg:  Level1 = PATHITEM(TableName[DuplicateWBS],1)

 

It will work in your case!

 

Please try it and let me know.

 

Thanks,

Siva

 

I appreciate your kudos. Please do mark this as the solution if it solves your issue.  

I have done it, New calculated coulmn

Tasklevel1 = PATHITEM('Tasks'[TaskWBS - Copy],1)  is created now all the tasks are having the 1 as entry in new calculated coulmn tastlevel1.

Great!

 

Similarly,

 

Tasklevel2 = PATHITEM('Tasks'[TaskWBS - Copy],2)

Tasklevel3 = PATHITEM('Tasks'[TaskWBS - Copy],3)

Tasklevel4 = PATHITEM('Tasks'[TaskWBS - Copy],4)

 

Use the newly created columns in your matrix instead of TaskWBS.

Done

Now i can see in taslevel1 the first digit of taskwbs value similarly in tasklevel2 second digit, taslklevel3 3rd digit, tasklevel4 4th digit of taskwbs-Copy

Sorry for the confusion!

The previous one will give the just value of the level. It won't give like 1 -> 1.1 -> 1.1.1

 

The below one will work as expected

Steps:

  1. Create calculated Column to measure the length
    • WBSLength = LEN('Table'[WBS])
  2. Create 4 columns for each level
    1. Level1 = IF( 'Table'[Length] >= 1, LEFT('Table'[WBS],1))
    2. Level2 = IF( 'Table'[Length] >= 3, LEFT('Table'[WBS],3))
    3. Level3 = IF( 'Table'[Length] >= 5, LEFT('Table'[WBS],5))
    4. Level4 = IF( 'Table'[Length] >= 7, LEFT('Table'[WBS],7))

 

 

@SivaMani  Yes it is working upto some extent however it's not 100% accurate, couldn't identify the any other issue.

 

1. Tasks showing at L0 is actually L3 tasks.

l0 = IF(Tasks[WBSlength]>=0, LEFT('Tasks'[TaskWBS],0))
2. Subtotal of 1 level is differnet when we do drilldown and drill up. I am putting 2 screenshot 1 for Level2 and anoter for level 3.
 
l2.JPGl3.JPG

i m trying it and will update you back.

 

my logic is let's search for dot(.) in orginal wbs if count of (.) is zero then level0, if count of(.) is 1 then level 1 and so on, Please suggest if that is doable

Helpful resources

Announcements
FabCon Global Hackathon Carousel

FabCon Global Hackathon

Join the Fabric FabCon Global Hackathon—running virtually through Nov 3. Open to all skill levels. $10,000 in prizes!

September Power BI Update Carousel

Power BI Monthly Update - September 2025

Check out the September 2025 Power BI update to learn about new features.

FabCon Atlanta 2026 carousel

FabCon Atlanta 2026

Join us at FabCon Atlanta, March 16-20, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.

Top Solution Authors
Top Kudoed Authors