Supplies are limited. Contact info@espc.tech right away to save your spot before the conference sells out.
Get your discountScore big with last-minute savings on the final tickets to FabCon Vienna. Secure your discount
in power bi matrix table, i have employee, project number in rows and in columns monthwise multiplier. When i drill down the project number, i have all the work orders present in the project number. I have the multiplier at work order level. I have calculated project level multiplier separately. However when i drill up, for the project it is automatically showing the aggregate of work order level multiplier, i dont want to aggregate this , i want to show for a project level a separate calculated multiplier
Hey @ChirSidh
you can IF and ISINSCOPE (https://dax.guide/isinscope/) to check the "level" you are currently looking at, and determine the "calculated multiplier" you want to display.
Hopefully, this provides what you are looking for.
Regards,
Tom
Hi Tom, i am using this formula ,
User | Count |
---|---|
65 | |
60 | |
47 | |
33 | |
32 |
User | Count |
---|---|
86 | |
75 | |
56 | |
50 | |
45 |