Hello,

 

I need your help one more time.

 

I have done two different measures to my data, and after that i have created a matrix to get a visual.

 

But now i want to divide measure 1 / measure 2, for this i have created a new measure (M3 = Divide(M1;M2))

but i'm getting the wrong results.

 

In below picture are my results, and in red my example.

 

11491.5/23= 499 and no 78.40

 

But the results for the total are correct.

 

 

Capture.PNG

 

 

 

Thanks

 

 

 

 

 

5 REPLIES 5
CahabaData
Memorable Member
Memorable Member

A measure performs within the context of its data set, (....and the context of the visual's filter - - but let's leave that issue alone for now).

 

For math between measures to work the visuals would have to all have the same data set.  Kind of an abstract statement I realize.

 

Rather than rely on the existing measures - it is my guess without seeing sample of the dataset's involved - that you need to construct this 3 rd measure from scratch.

 

Also I notice your 3rd measure is a different time period - that must be part of the measure's definition in using the prior period's data.

www.CahabaData.com

Hi have the above data set's.

 

Data Set 1 - Material per equipment

DateOperationEquipmentType MaterialQty

 

Data Set 2 - Work Hours per equipment

 

DateOperationEquipmentHours

 

And another one that is a calendar.

 

I want to calculate the qty of material by equipment per hour of work in the last 3 months.

 

I have created 2 measures: 

M1:  gives me the total of material in the last 3 months.

 M1 = Calculate(sum('Data Set 1'[Qty]); datesinperiod ('Calendar'[Date]; lastdate('Calendar'[Date]);-3;Month))

 

M2: gives the total of hour's worked in the las 3 months.

 M2 =Calculate(sum('Data Set 2'[Hours]); datesinperiod ('Calendar'[Date]; lastdate('Calendar'[Date]);-3;Month))

 

All this meausres work well, but when i divide hours by qty of material i get correct results for the total (picture below).

M3 = divide(M2;M1)

 

 

 

 

M3 total.jpg

 

But when i want result's per equipment, i get wrong results. the only resutls that are correct are the totals.

 

m3 eq.jpg


@janeca wrote:

Hi have the above data set's.

 

Data Set 1 - Material per equipment

Date Operation Equipment Type Material Qty

 

Data Set 2 - Work Hours per equipment

 

Date Operation Equipment Hours

 

And another one that is a calendar.

 

I want to calculate the qty of material by equipment per hour of work in the last 3 months.

 

I have created 2 measures: 

M1:  gives me the total of material in the last 3 months.

 M1 = Calculate(sum('Data Set 1'[Qty]); datesinperiod ('Calendar'[Date]; lastdate('Calendar'[Date]);-3;Month))

 

M2: gives the total of hour's worked in the las 3 months.

 M2 =Calculate(sum('Data Set 2'[Hours]); datesinperiod ('Calendar'[Date]; lastdate('Calendar'[Date]);-3;Month))

 

All this meausres work well, but when i divide hours by qty of material i get correct results for the total (picture below).

M3 = divide(M2;M1)

 

 

 

 

M3 total.jpg

 

But when i want result's per equipment, i get wrong results. the only resutls that are correct are the totals.

 

m3 eq.jpg


@janeca

Could you try

M2 =
CALCULATE (
    SUM ( 'Data Set 2'[Hours] ),
    DATESINPERIOD ( 'Calendar'[Date], LASTDATE ( 'Calendar'[Date] ), -3, MONTH ),
    ALLEXCEPT ( 'sometable', 'sometable'[jumbo] )
)

If it still doesn't work, would you mind sharing the pbix file? You could mask sensitive data before uploading it to a network drive and share the link.

@Eric_Zhang

 

Hi Eric, 

 

It still doesn´t work.

 

My pbix file is in the above link.

 

https://drive.google.com/open?id=0By056bzPjl9POFNqZzJlM1VyeVk

 

Thanks for your helph. 

janeca
Frequent Visitor

@Eric_Zhang could you helph me with this? 

Helpful resources

Announcements
Fabric Data Days Carousel

Fabric Data Days

Advance your Data & AI career with 50 days of live learning, contests, hands-on challenges, study groups & certifications and more!

October Power BI Update Carousel

Power BI Monthly Update - October 2025

Check out the October 2025 Power BI update to learn about new features.

FabCon Atlanta 2026 carousel

FabCon Atlanta 2026

Join us at FabCon Atlanta, March 16-20, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.

Top Solution Authors