Assistance with Measure for Total Scheduled Ops
Hi All,
I would appreciate any assistance with how to structure my DAX formula, to determine “Total Scheduled Ops”?
My Model Logic, (Referencing the image below please)
- My data source is “G1-Axz”
- I have seven columns in my dataset
- I have created a “Table” visualization in Power BI, and
- I have introduced the following “Filters”
- Harvest Week Production Unit Type
- Area Name
Required,
- I’m attempting to create a measure that will enable me to calculate the
- Total Scheduled, Down Time, for the Operational responsibility, measure name is (Sched.Ops)
The result should be,
- Sched.Ops = 48.63 hrs
Any assistance will be most appreciated
Cheers,
Lance
3 Replies
- Greg_Deckler
Community Champion
So Sched.Ops is the SUM of "Total Down Time (hrs)"? Is "Total Down Time (hrs)" a column or a measure?
- Lance_CMFrequent Visitor
Greg,
- Total Down Time (hrs) is a column, for further clarification, please reference the introduced table?
To provide context, this is the logic of my data and subsequent measures I have to derive,
- I work on a 168 hr week (Monday morning 6am to Monday morning 6am)
- Delays for the week period is captured against various production unit types
- Delays are either scheduled or Unscheduled (Y or N)
- Delays can also be attributed to either Operational, Mechanical or Electrical responsibility
I am trying to determine the following DAX measures:
- _Scheduled Ops Delay (hrs) =
Typical Calculation syntax would be,
IF ([Responsibility]="Operational")
AND [Scheduled]="Y"
THEN [Total Down Time (hrs)]
END
What would the DAX measure for "Scheduled Ops" be?
I trial and errored my way to get a working formula, see code below?
I'm not even sure whether this is the best approach?
= CALCULATE('G1-Axz'[Total Down Time (hrs)], FILTER('G1-Axz'[Responsibility]= "Operational" && 'G1-Axz'[Scheduled (copy)] = "Y"))I was unable to get the OR formula to work for maintenance delays, that have to consider both mechanical and electrical delays?
- _Unscheduled Maint Delay (hrs) =
Typical Calculation syntax would be,
IF ([Responsibility]="Electrical" OR [Responsibility]="Mechanical")
AND [Scheduled]="N"
THEN [Total Down Time (hrs)]
END
What would the DAX measure for "Unscheduled Maint" be?
Any assistance will be appreciated mate?
Cheers,
Lance
- Lance_CMFrequent Visitor
Hi Greg,
Can you please have a look at my response to your question?
Cheers,
Lance