Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!Calling all Data Engineers! Fabric Data Engineer (Exam DP-700) live sessions are back! Starting October 16th. Sign up.
I am trying to run the Forecasting with ARIMA visual and get the following error:
Error in bcloglik(x, lower, upper) : x must be positive
Calls: FindBoxCoxLambda -> BoxCox.lambda -> bcloglik
Execution halted
This is after adding 0's into my dataset to have my dates be evenly spaced intervals and to forecast including values of 0. I found code on github showing x must be <= 0 or else return the error message. How do I forecast including values of 0? I would like to leave BoxCox in this visual turned on to auto set the lambda.
hi,@elihibdon
I have tested on my side, but not reproduce the issue. and we need more detail steps for us.
Please share your demo pbix for us. You can upload it to OneDrive or Dropbox and post the link here. Do mask sensitive data before uploading.
Best Regards,
Lin
Join the Fabric FabCon Global Hackathon—running virtually through Nov 3. Open to all skill levels. $10,000 in prizes!
Check out the September 2025 Power BI update to learn about new features.