I am having trouble creating a line chart based on the filtered table below. It shows the Status (Stage) in production, how long it takes to get to that stage (Running Total), and a lookup to a calendar day for the completion of the stage. The Calendar table has an index of working days.
I use the measure below to calculate the end date of different stages.
I can put this in a table visualization...
However I can't seem to get any sort of visualization to work that shows Status Num vs Projected Status Date. Power BI won't let me drop the Project Status Date measure in the X or Y axis fields.
Thanks!
Thank you @amitchandak , I am still confused on how this will allow me to make relationships with the new date column.
@btfergie , I have used the whole number here, you need a calendar and your date measure
Dynamic segmentation -Measure to Dimension conversion: https://youtu.be/gzY40NWJpWQ
Another example
Customer Retention with Dynamic Segmentation, New/Lost/Retain Customer Count: https://www.youtube.com/watch?v=W4EF1f_k6iY
Check out the July 2025 Power BI update to learn about new features.
This is your chance to engage directly with the engineering team behind Fabric and Power BI. Share your experiences and shape the future.
User | Count |
---|---|
23 | |
10 | |
10 | |
9 | |
7 |