Hi All,

I facing the below error on my schedule refresh.

Data source errorResource Governing: This operation was canceled because there wasn’t enough memory to finish running it. Either increase the memory of the Premium capacity where this dataset is hosted or reduce the memory footprint of your dataset by doing things like limiting the amount of imported data. More details: consumed memory 16684 MB, memory limit 16679 MB, database size before command execution 8920 MB. Learn more, see https://go.microsoft.com/fwlink/?linkid=2159753

 

My enviormnent:

Power BI Premium Capacity P1 with autoscaling feature on.

 

Any one have idea where I need to change the memory or I need to upgrade the capacity to P2..?

Thanks for your kind reply.

 

1 ACCEPTED SOLUTION
Anonymous
Not applicable

Hi @ImranAslamSSW ,

When the data refresh commences but fails to complete, it can be due to several reasons:

  • Insufficient memory, even if there is only one model in the Premium capacity, i.e. the model size is very large.
  • Non-capacity reasons, including datasource system disconnection, invalid permissions or gateway error.

Capacity Admins (and Power BI service administrators) can monitor the Refresh Failures due to out of Memory metric.

 

When additional Premium capacity is required, there are two options:

  • Scale-up an existing Premium capacity
  • Add a new Premium capacity

More details: Optimizing Premium capacities 

 

If you want to upgrade the capacity to P2. Power BI admins and global administrators can change Power BI Premium capacity. Capacity admins who are not a Power BI admin or global administrator don't have this option.

  1. Select the capacity name you want to change the size of.

  2. Select Change size. You can see.

  3. On the Change size screen, upgrade or downgrade your capacity as appropriate.

More details: Change capacity size 

 

Relevant Document: Configure workloads in a Premium capacity 

 

Best Regards

Community Support Team _ Polly

 

If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.

View solution in original post

1 REPLY 1
Anonymous
Not applicable

Hi @ImranAslamSSW ,

When the data refresh commences but fails to complete, it can be due to several reasons:

  • Insufficient memory, even if there is only one model in the Premium capacity, i.e. the model size is very large.
  • Non-capacity reasons, including datasource system disconnection, invalid permissions or gateway error.

Capacity Admins (and Power BI service administrators) can monitor the Refresh Failures due to out of Memory metric.

 

When additional Premium capacity is required, there are two options:

  • Scale-up an existing Premium capacity
  • Add a new Premium capacity

More details: Optimizing Premium capacities 

 

If you want to upgrade the capacity to P2. Power BI admins and global administrators can change Power BI Premium capacity. Capacity admins who are not a Power BI admin or global administrator don't have this option.

  1. Select the capacity name you want to change the size of.

  2. Select Change size. You can see.

  3. On the Change size screen, upgrade or downgrade your capacity as appropriate.

More details: Change capacity size 

 

Relevant Document: Configure workloads in a Premium capacity 

 

Best Regards

Community Support Team _ Polly

 

If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.

Helpful resources

Announcements
Join our Fabric User Panel

Join our Fabric User Panel

Share feedback directly with Fabric product managers, participate in targeted research studies and influence the Fabric roadmap.

February Power BI Update Carousel

Power BI Monthly Update - February 2026

Check out the February 2026 Power BI update to learn about new features.

FabCon Atlanta 2026 carousel

FabCon Atlanta 2026

Join us at FabCon Atlanta, March 16-20, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.