Forum Discussion
Anonymous
6 years agoNot applicable
Connectivity between Control-M and Power BI
Hi All,
Does any one have any idea about connectivity between Control-M and Power BI ?
I want to achive event based scheduling for Power BI Reports(Paginated Reports).
We are trying to implement even based scheduling in our project. Currenly , In existing architechture they are using control M for scheduling the crystal reports. Is there any other way ? Can we integrate Control M and Powerbi reports using some API ?
Thanks in advance.
1 Reply
- d_gosbellSuper User
You could probably use a similar approach to the one I outlined here https://community.powerbi.com/t5/Report-Server/Refresh-Power-BI-using-company-scheduler/m-p/987057